Roofs built for Texas hail.
Follow one Central Texas roof from the storm that breaks it to the final walk-through.
Step 1 of 6
The sky goes green
You call or send the form
Hail doesn't always leave a leak you can see. Tell us what happened and we book an inspection, usually within a couple of days.
Step 2 of 6
Inspection with photos
We go on the roof and document what we find
Every hit gets a chalk circle and a photo. You get the pictures, and so does your insurance adjuster. Select a marker to look closer.
Step 3 of 6
Written estimate
An exact number, before you commit
Materials, labor and any decking repairs are spelled out line by line. The inspection is free.
Step 4 of 6
Schedule and materials
You pick the shingle color
Try one on this roof. We order it and set a start date.
Step 5 of 6
Install and daily cleanup
Tear-off
Everything comes off, down to the deck. Most homes take one to two days from here.
Deck repair
Rotten sheets get cut out and replaced, exactly as written in your estimate.
Underlayment
Ice-and-water membrane at the eaves, synthetic underlayment above it, and metal drip edge around the rim.
Class 4 shingles
Laid from the eaves up, each course lapping the last. Class 4 is the top impact rating in the UL 2218 test.
Seamless gutters
Made to length on site, so there are no seams to leak.
Magnet sweep
Yard and driveway, at the end of every day.
Step 6 of 6
Final walk-through
We check the job with you and hand over the warranty paperwork
Demo concept: a fictional company. Design by Ali Topashev.